AI for construction › Design & Review
The problem
Every MEP sheet looks fine alone. Above the ceiling, it does not fit.
The duct, the drain and the tray each fit on their own drawing. Put together, they fight for the same space, and you find out when the ceiling crew cannot close up.
The fix ↓
Catch the MEP clashes before site does.
For construction companies with 3 to 50 staff. Pick the systems on your job. Get the checks for each one, and see if it all fits above the ceiling. Print it for your next meeting.
Try it: will it fit above the ceiling?
| Height or depth | Size (mm) |
|---|---|
| Floor to bottom of the deepest beam (mm) | |
| Finished ceiling height (mm) | |
| Ceiling grid and light fixtures (mm) | |
| Biggest duct, with insulation (mm) | |
| Sprinkler pipe (mm) | |
| Other pipe or conduit crossing (mm) | |
| Hangers and a working gap (mm) |
Type your sizes to see the space left.
Type your own sizes. Nothing is sent.
Get a free MEP checklist for your job: the checks for each system, and if it all fits above the ceiling.
Get your AI employee to do this and moreGet a free MEP checklist for your job: the checks for each system, and if it all fits above the ceiling.
1. Pick the systems on your job
Pick every system on this job. The structure and ceiling checks are always in.
2. Your result is ready. Where should we send it?
It shows right here the moment you tap the button. A copy goes to your email.
Here is your result.
Want this done on every job? Our AI Employee does this work for your team, and 100 more office jobs.
Book a free callTrusted by 85+ businesses across the GTA for 6+ years
Less rework. Money saved.
of redo work starts with bad notes or wrong info. Clear records stop it before it starts.
of the cost of a job goes to redo work. On a $2M job, that is about $100,000 you can keep.
is what one RFI costs to answer. A typical job has 796 of them. Fewer and faster RFIs save that money.
Each number comes from the study named on its card. Your own number is in your free result.
Free. No call needed.
Hang each trade. See if it fits.
Tap each service to hang it in the space between the beam and the ceiling, at the far end of an 18 m corridor run. Then let the AI Employee make it fit.
Space above the ceiling
Beam at 3 350 mm. Ceiling at 2 700 mm. Hang the first service.
Fix plan and RFIs, by the AI Employee
It fits with 45 mm to spare, on paper. 4 RFIs drafted with sheet numbers. Your team and the engineer decide each fix.
An example with made-up job details. On a call we run it on your own MEP and architect's sheets.
Want the MEP sheets checked against each other before work reaches site?
Let AI do the busy work. Your team stays in charge.
- It reads the mechanical, plumbing, electrical and architect's sheets side by side.
- It flags where systems fight for the same space, or do not match each other.
- Your team decides the fix. It writes the RFIs and tracks the answers.
Around this job, the same AI Employee also:
- Reads drawings and specs and answers your team's questions.
- Writes RFIs and chases late answers.
- Finds new bids that fit your work, every morning.
- Writes the daily report from site notes and photos.
- Builds the submittal list from the spec book.
30 minutes. We show you this job done on your own work.
Beyond MEP coordination.
One AI Employee works across your whole company, from the first estimate to the last warranty call, plus the office work around it. Let AI do the busy work. Your team stays in charge.
- Email triage and replies
- Client and owner updates
- Follow-ups on quotes
- Invoices and payment chasing
- Meeting notes and action items
- New lead replies
- Website and marketing posts
- Booking site visits and calls
Works with the tools you already use.
Don't see yours? We connect it for you, built to order.
- 85+businesses served
- 6+ yearsacross the GTA
- 5 of 5stars on every review
Highly recommend the team at Veebar Tech! They’ve been a great partner for our web development, coding, and AI needs, taking the time to understand our business and recommend practical solutions. They explain technical concepts clearly, communicate well, and are easy to work with. A knowledgeable, professional, and reliable team—we’re glad to have their support.
Great company to work with, incredibly detail oriented and easy to work with. We really appreciated how they focused on solving the problem, not just appeasing customer desires. The work was returned ahead of schedule with capabilities on par and beyond what we were expecting. …
From free call to live, in 4 steps
30 minutes. We show you this job done on your own work. You keep the free tool either way.
Built around your company, your templates and your tools. Your team does not learn new software.
Ready in 4 to 14 days for most companies. You get the date in writing first.
Not happy in 30 days? You get a full refund.
Free call. No pressure. You keep the tool either way.
Short answers.
What is MEP coordination in construction?
It is making sure mechanical, electrical and plumbing work fit together, and fit the building, before anyone installs.
What is the order of priority for MEP above a ceiling?
Gravity drains usually go first, because they need a steady slope. Large ducts come next, then sprinkler and pressure pipes, then cable tray and conduit, which can bend around the rest. Many teams use this order.
What are the most common MEP clashes?
Ducts hitting beams, drains with no room for their slope, sprinkler lines crossing ducts, and no space left to reach valves and access panels. Most come from too little space above the ceiling.
Who is responsible for MEP coordination?
It depends on the contract. Often the GC or the mechanical contractor leads it, and each trade draws its own work. Check Division 01 of your spec for who runs the meetings and signs off.
How much space do you need above a ceiling for MEP?
It depends on the job. Add up the biggest duct, the drain slope over its run, hangers, insulation and room to work, then compare it with the space under the beam. The ceiling check on this page does the sum for you.
Can AI find MEP conflicts in drawings?
Yes, for the first pass. Our AI Employee reads the MEP and architect's sheets side by side and flags conflicts. Your team decides the fix.
Still have a question? Ask it on a free call.
Get it free. Then see it done for you.
Want the MEP sheets checked against each other before work reaches site? Book a free call. We show you how.
