The problem

Field changes live in the super's head, so the as-builts are wrong at handover.

Two years later the owner cuts into a wall where the drawing says nothing runs. They call you, and nobody remembers where the pipe really went.

The fix ↓

01 Free redline log. Start it here.

Get every field change on the as-builts.

For construction companies with 3 to 50 staff. Log the changes from site. See which ones are not on the as-builts yet, which are too old, and what each trade's as-builts must show.

What your redline log looks like

2not on the as-builts
1older than 30 days
SheetChangeOpenStatus
M-301Duct moved 600 mm east, grid C41 daysToo old
E-201Panel LP-2 moved to room 1089 daysNot drawn
A-102Door 104 is 900 mm, not 8003 daysDone

Example lines. Yours uses your own sheets and changes.

Get a free check of your as-built changes: what is not on the drawings yet, and what each trade must show.

Free redline log. Start it here.

Get your AI employee to do this and more

Trusted by 85+ businesses across the GTA for 6+ years

  • 6ixBuild logo
  • 6ixDesign logo
  • Ava Window Fashions logo
  • Expert Tools Rental logo
  • 6ixDev logo
  • MOSTAVIO logo
  • SkyTech Mostavio logo
  • VAG Programming logo
★ The results owners want

Hours back. Less rework.

hours back
5.5 hrs

a week is spent by each person just to find drawings and files. The AI Employee finds them for you.

FMI and PlanGrid, Construction Disconnected, 2018
hours back
14+ hrs

a week is lost by each person on your team. Most of it goes to redo work and to chase info. You get that time back.

FMI and PlanGrid, Construction Disconnected, 2018
cost cut
48%

of redo work starts with bad notes or wrong info. Clear records stop it before it starts.

FMI and PlanGrid, Construction Disconnected, 2018

Each number comes from the study named on its card. Your own number is in your free result.

Get yours free

Free. No call needed.

▶ Try it

Drag to see what really got built

Drag the bar across the plan. Left is the design, right is what the crew built. Count the changes you can spot, then let the AI Employee show its redline log.

Design (issued for construction)As built (example job)

Drag the bar to the right.

An example with made-up job details. On a call we run it on your own site reports, RFIs and change orders.

Book a free call

Want every field change logged for the as-builts while the job runs?

02 How AI does this job

Let AI do the busy work. Your team stays in charge.

  1. It reads site reports, RFIs, change orders and photos as they come in.
  2. It adds every field change to the redline log with the sheet, the grid and a photo.
  3. Each Friday it sends the super the open redlines to check.

Around this job, the same AI Employee also:

  • Names each file and puts it in the right job folder.
  • Keeps the as-built log, the asset list and the warranty list up to date.
  • Logs service calls and sends the right trade.
  • Tells you and the owner what is due, and when.
  • Finds new bids for you, every morning.
Book a free call

30 minutes. We show you this job done on your own work.

03 Beyond this job

Beyond as-built redlines.

One AI Employee works across your whole company, from the first estimate to the last warranty call, plus the office work around it. Let AI do the busy work. Your team stays in charge.

55 jobs it can take on. Tap one to try its free tool.

Works with the tools you already use.

Works withGmail
Works withOutlook
Works withTeams
Works withSlack
Works withWhatsApp
Works withZoom
Works withCalendar
Works withDrive
Works withSheets
Works withDocs
Works withNotion
Works withDropbox
Works withHubSpot
Works withSalesforce
Works withMailchimp
Works withQuickBooks
Works withXero
Works withStripe
Works withShopify
Works withWordPress
Works withGoogle Ads
Works withMeta Ads
Works withLinkedIn
Works withZapier
Works withAirtable
Works withAsana
Works withJira
Works withGitHub
Works withCanva
Works withGoogle Analytics
Works withInstantly
Works withGoHighLevel

Don't see yours? We connect it for you, built to order.

5.0★★★★★ Google rating from 4 reviews
  • 85+businesses served
  • 6+ yearsacross the GTA
  • 5 of 5stars on every review
Read them on Google →
Farhang TaherGoogle review, October 2026
★★★★★
Highly recommend the team at Veebar Tech! They’ve been a great partner for our web development, coding, and AI needs, taking the time to understand our business and recommend practical solutions. They explain technical concepts clearly, communicate well, and are easy to work with. A knowledgeable, professional, and reliable team—we’re glad to have their support.
Connor CiotlosGoogle review, October 2026
★★★★★
Great company to work with, incredibly detail oriented and easy to work with. We really appreciated how they focused on solving the problem, not just appeasing customer desires. The work was returned ahead of schedule with capabilities on par and beyond what we were expecting. …

From free call to live, in 4 steps

  1. 30 minutes. We show you this job done on your own work. You keep the free tool either way.

  2. Built around your company, your templates and your tools. Your team does not learn new software.

  3. Ready in 4 to 14 days for most companies. You get the date in writing first.

  4. Not happy in 30 days? You get a full refund.

Book a free call

Free call. No pressure. You keep the tool either way.

04 Questions

Short answers.

What are as-built drawings?

Drawings that show the building as it was really built, with every change from the field. The changes are first marked by hand on the site set, often in red, which is why they are called redlines.

What is the difference between as-built drawings and record drawings?

As-builts are the marked-up set the contractor and trades keep during the job. Record drawings are usually the clean set made from them for the owner. Check your contract, because the terms vary.

Who is responsible for as-built drawings?

Usually the contractor, with each trade marking up its own work. Your contract and spec say who draws the final set and when it is due.

How do you keep as-built drawings up to date during a job?

Log each change when it happens, with the sheet, the grid, the date and a photo. At closeout nobody remembers where the pipe really went.

What are common as-built mistakes?

Leaving all the changes until closeout. Covering hidden work before anyone takes a photo. Trades that hand in nothing until they are chased.

Can AI help keep as-built drawings up to date?

Yes, for the tracking. Our AI Employee reads site reports, RFIs and change orders and keeps the redline log for you. Your team still checks each change.

Book a free call

Still have a question? Ask it on a free call.

05 Next step

Get it free. Then see it done for you.

Want every field change logged for the as-builts while the job runs? Book a free call. We show you how.